Wednesday, November 17, 2004

This is what I need to concentrate on:

Deck Plugs
Priority: severe
Description: remove bolt from missing deck plug holes, clean, drill .5 inch deeper, apply west system, plug (orient with grain), plane and sand as needed

antenna on mast
priority: non critical
Description: mount marine and 2 meter antenna on mast. route cables through mast

hull painted
priority: severe
haul out (after bottom scraped), apply bottom coat, repair rub rail, boot stripe, paint above rub rail?

holding tank
priority: severe
install holding tank in forward vberth, connect head discharge to holding tank intake, holding tank discharge to through-hull, pump out connection on top of holding tank accessible through forward hatch

insurance
priority: critical
list requirements:

Cabin Interior:
priority: non critical
Identify upholstery source & cost (will need to measure cushions)

Cabin Interior:
priority: non critical
Sand and varnish worn deck
Smooth and paint uneven surfaces
Sand, apply polysulfide bedding compound, varnish bridge

Engine
Priority: severe
schedule appt with Gary for oil change and sacraficial zincs